OneOffice 3000 Works Order Processing links with OneOffice 3000 Bill of Materials to provide manufacturing management and costing facilities. Works orders can be raised directly
or back to back with sales orders and entry of a required completion
date generates a latest start date for the order to be completed on
time, taking into account machine loadings for all current works
orders.
Features include:
Actual, standard and latest costing, with comprehensive variance analysis
Unlimited routeing and route-dependent costing
Workstation analysis, including operating efficiency for each shift
Unlimited operations, with separate standard times for set-up and unit production
More than 700 labour types and pay rates
Quality assurance specifications and test result recording
Gross contribution report, with drill down to component/labour type variances
Production tracking
Comprehensive batch and serial number tracking
Extensive reports and enquiries, including workstation and labour utilisation